Commercial Tower Development 2
High-capacity deep foundations and contiguous shoring systems engineered for dense urban high-rise towers.
1200 MMPile Diameter
38 MMaximum Depth
4 MONTHS+Project Duration
MIXED STRATAGround Conditions
TEMPORARY CASINGMethod

CONFIDENCE BUILT
BELOW GROUND.
The project was delivered safely and within programme requirements while meeting foundation performance criteria and protecting surrounding structures.
PROJECT HIGHLIGHTS
Delivered within schedule
Zero major safety incidents
Successful load testing
Foundation ready for superstructure works
Success depended not only on execution, but on selecting the right methodology from the outset.







RELATED PROJECTS
01

REPEAT CLIENTS
The number of clients who trust us with a second project.
02

TEAM TENURE
The average number of years our people stay with FEC.
03

TIMELY DELIVERY
Projects delivered in line with committed programmes.
04

GROWING REACH
Successfully delivering projects across 20+ cities.