Infrastructure Bridge Pier Foundation

Large-diameter bored piles and marine geotechnical works for critical highway and rail infrastructure.

1200 MMPile Diameter
38 MMaximum Depth
4 MONTHS+Project Duration
MIXED STRATAGround Conditions
TEMPORARY CASINGMethod
Foundation workers on rebar grid at deep basement site

CONFIDENCE BUILT
BELOW GROUND.

The project was delivered safely and within programme requirements while meeting foundation performance criteria and protecting surrounding structures.

PROJECT HIGHLIGHTS

Delivered within schedule
Zero major safety incidents
Successful load testing
Foundation ready for superstructure works

Success depended not only on execution, but on selecting the right methodology from the outset.

Foundation and high-rise construction tower crane
Excavator digging trench at foundation work site
Heavy earth trenching and foundation machinery
Foundation earthworks and excavation mound
Foundation piling rig and construction machinery
Deep excavation site preparation
Heavy machinery and earth moving operations

RELATED PROJECTS

01
REPEAT CLIENTS

REPEAT CLIENTS

The number of clients who trust us with a second project.

02
TEAM TENURE

TEAM TENURE

The average number of years our people stay with FEC.

03
TIMELY DELIVERY

TIMELY DELIVERY

Projects delivered in line with committed programmes.

04
GROWING REACH

GROWING REACH

Successfully delivering projects across 20+ cities.